Monday, August 25, 2014
Road Repair continued
Ricky Tillman has done an excellent job. As the work was progressing, we added several items, resulting in a total cost of $600, an increase of $150. This is an amazing bargain for the work that was done. Added items included: widening of road by 8 feet at this uphill stretch to allow for better sun drying after a rain, 3 washout basins near new cross road trenches (each with multiple boulders), several spot patches between gate and damaged area. See Youtube video. If you have not visited your property recently, this is a great time.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment